
ONSHORE EMERGENCY PIPELINE REPAIR SYSTEM (EPRS)
Project Description
Client: DOLPHIN ENERGY
Location: Abu Dhabi – various locations
Year: 2023 – 2025 (2 + 1 Years)
Scope:
- Sectional Replacement including coating Reinstatement.
- Grinding and dressing repair.
- Leak clamp repairs.
- Steel sleeve repairs.
- Composite repair.
- Wash-out of pipelines and rectification of free-spans.