EXECUTION OF MODIFICATION FOR THE CONSTRUCTION OF DRILLING FLUID LOADING FACILITY IN RUWAIS REFINARY #3

Home/EXECUTION OF MODIFICATION FOR THE CONSTRUCTION OF DRILLING FLUID LOADING FACILITY IN RUWAIS REFINARY #3
EXECUTION OF MODIFICATION FOR THE CONSTRUCTION OF DRILLING FLUID LOADING FACILITY IN RUWAIS REFINARY #3
Project Description

Client: ADNOC
Location: RUWAIS
Year: 2023 – 2025 (15 Months)

Scope:

  • Design, Supply and Construction of drilling fluid skid.
  • Design, Supply and Construction of sump vessel & supply of sump pump.
  • Construction package consists of piping, mechanical, civil, structural, E&I works.
  • Asphalt road construction for the truck movement.
  • Demolition & extension of structural steel shed in the loading area.
  • DCS / ESD integration with respective OEM.